Annual production capacity of 500 million pieces of high-precision automotive seals and 1.2 million sets of EASSS oil pump upper and lower sliding bush project environmental impact assessment information public Show
Time:
2022-03-07
I. Basic information of the construction project
This project is a new project, the project construction site is located in Jiaojiang District, ten ponds three nine river road to the east, south of the planning road. The total land area of this project is 32,176 square meters, and the construction area of new houses is 43,122 square meters. The project mainly acquires closed type rubber making system, vulcanizing machine, automatic inspection machine and other equipment. After the completion of the project, it can form the production capacity of 500 million pieces of high-precision automotive seals and 1.2 million sets of EASSS oil pump upper sliding bush per year. The total investment of the project is 135 million yuan, including fixed assets investment of 122 million yuan.
Second, the distribution of the main environmentally sensitive targets within the scope of environmental impact assessment
The main environmental sensitive targets within the scope of environmental impact assessment are the Taizhou Bay Recycling Industrial Gathering Area Management Committee 850m to the east of the enterprise boundary, the Moon Lake District 910m to the northeast, and the Chenglong Village 1800m to the west.
Main environmental impact prediction
The construction period is mainly for construction domestic sewage, washing wastewater, construction dust, construction noise, construction debris and domestic garbage, etc. The construction period is short, and will not cause significant impact on the surrounding environment after taking reasonable measures.
Waste water during operation is mainly domestic sewage, cleaning waste water and other waste water, which will be discharged into the sewage network after treatment by in-plant sewage treatment facilities and will not cause significant impact on the surrounding environment; waste gas is mainly sulfide waste gas, injection molding waste gas, etc., which will be collected and reduced by adsorption and other measures, and will not cause significant impact on the surrounding environment; noise is mainly machinery and equipment noise, which will be reduced by adopting measures such as sound insulation and vibration damping, so that the noise at the plant boundary will reach the standard; solid waste is mainly side waste, which will be discharged to the surrounding environment. Solid wastes are mainly edge materials, defective products, filter glue waste, packaging materials, household garbage, etc., which will have no impact on the surrounding environment after being collected and properly treated and disposed. The project will have little impact on the surrounding environment if reasonable prevention and control measures are taken to make each pollutant meet the standard emission.
IV. Main environmental protection measures to be taken, environmental risk prevention measures and expected effects
During the construction period, the impact on the external environment can be reduced to a low level after taking measures such as external transportation of domestic sewage, reuse of flushing wastewater, dust reduction, noise reduction, backfilling of solid waste and timely removal.
During the operation period, process wastewater such as cleaning wastewater and domestic sewage will be discharged into the sewage network after the wastewater treatment facilities in the plant reach the standard; vulcanization waste gas and injection molding waste gas will be discharged at high altitude after collection and treatment by absorption and adsorption; low-noise equipment will be selected and high-noise equipment will be insulated and noise reduced to reduce the noise impact; solid waste will be collected and disposed of separately in strict accordance with relevant norms. Establish emergency response system for sudden environmental events, prepare and implement emergency plans. The pollution prevention and control measures adopted in this project are economically reasonable and technically feasible, and can ensure the emission of pollutants up to the standard.
V. Preliminary conclusion of environmental impact assessment
All kinds of pollutants generated by the project are within the tolerable range and the environmental risks are within the acceptable level after treatment by corresponding measures. The project is basically in line with the principles of environmental protection approval.
VI. Content of the consultation
The scope of public opinion, the main matters: the project is located in the region of the authorities, enterprises and institutions and individuals can put forward comments and suggestions on the reasonableness of the location of the project, pollution prevention and control measures or other issues related to the project, and explain the reasons. If you need further information about the project, you can check the environmental assessment documents at Zhejiang Taicheng Environmental Technology Co.
Public feedback channels: the public can submit comments by letter, telephone, fax, e-mail, etc., to the EIA unit Zhejiang Taicheng Environmental Technology Co.
Construction unit: Zhejiang Haiwei Technology Co., Ltd. Contact: Chen Gong Tel: 13566888450
Address: Zhejiang Haiwei Technology Co.
Ltd. Contact: Mr. Lu Tel: 0576-89811038
Address: 23rd floor, Building 4, Wanda Plaza, Taizhou Economic Development Zone
Environmental Protection Approval Department: Jiaojiang District Environmental Protection Branch Approval Section Tel: 0576-88837292
The period for comments: 10 working days from the release of information (letters postmarked).